Day One
Day Two
Day Three
Day Four
Day Five
Day Six
Day Seven
Day Eight
Day Nine
Day Ten
Finishing touches
Backyard before beginning the project
Side yard
Looking up the hill
Retaining wall w/ pond boulders
Excavation begins. Note dismantling of retaining wall
Digging the pond
Digging pond
Note terraces on excavation
Installing pond liner
The first of the boulders being prepped to move into place.
Placing the cranes and boulders.
Boulders begin to define the pond outline.
A large crane is needed to position boulders.
Detail of one border boulder.
Workers continue to place and arrange boulders.
Bridge is installed.
View from owners bedroom.
First stream (left) is being lined with rocks.
First stream from upper pond.
View from bedroom.
Pump assembly being installed
Detail of cranes
Completed view from bedroom (before landscaping).
Detailed view of streams entering pond.
Detail of stream
Waterfall
Upper pond.
Upper pond leading to stream.
Stream Detail
Waterfalls
Waterfalls from water level
Lighting view from pond.
View at water level
Cranes with waterfalls.
Landscaping